Project-level Reporting

Project-level Reporting

Project-level reporting is optional but strongly encouraged.

 

I have a master plan project that set standards for material selection on future campus buildings. Can I report it?
Not at this time, but please continue doing this very important work. The pledge is aimed at reporting only completed built works and the specific materials used within them. 

I report my projects for the AIA 2030 Commitment, can I also report for the Materials Pledge?
Yes. These two programs are complimentary, and reporting the same projects to each commitment is encouraged. If you have a project number associated with the project in the Design Data Exchange (DDx) you may reference this number when reporting for future integration efforts. 

Does the AIA Materials Pledge ask for final, as-built information?
Not at this time. Currently, reporting is based on the Construction Documents (final design) drawing IFC/CD set. In the future as the data landscape becomes more integrated, we hope it becomes more feasible to track the final products in our projects.

 

For more information please see the Materials Pledge Reporting Guide or email materials@aia.org.