Validation checks
There will now be alerts when inputting data in both the DDx interface and using the Bulk Import method. Validations include:
Square footage: Projects should not be smaller than 100 GSF or larger than 5,000,000 GSF
Fuel Sources: Projects are unable to have renewable sources without having a primary source
pLPD: There is a limit between 0 - 5.
pEUI: There is a warning for when project’s pEUI is more than double the size of the baseline
Energy modeling & embodied carbon tools
If a project was energy modeled or includes embodied carbon data, users can no longer select simply “Other.” Instead, upon clicking “Other,” the system will prompt you with a text box to write in which tool was utilized. This is also reflected when selecting tools using the Bulk Import function.
We’ve added and discontinued several energy modeling tools. Highlighted in green are new additions and highlighted in red are discontinued.
CBECC (Title 24 Compliance Tool)
CBECC-Res (Title 24 Compliance Tool)
EPIC Tool
EnergyGauge Summit - DOE -2.1E
Energy Gauge Summit, DOE 2.2E
TRACE 3D+
30 AEDG AEDG
50 AERG AEDG
DOE - 2.2 GreenBuildingStudio
We’ve included new embodied carbon tools as well.
Tally LCA
ECOM
EPIC Tool
Tally CAT
cove.tool
CARE Tool
New energy code
In response to a growing demand, we have now included the 2022 Commercial California Energy Code, Title 24 to the list of available energy codes.
Track Data: Fuel Source Section
The fuel source section has a few new components, although the data entry process remains the same. The new components added are to assist valid entry of fuel source values for the project, and to provide the net operational carbon breakdown for the project in addition to the net operational energy breakdown.
Operational emissions calculation
There is now operational carbon values attached to projects created in 2023 and beyond.
The methodology for calculating GHG emissions in the AIA 2030 DDx is the same methodology that is used in Portfolio Manager.1 The methodology is based on the Greenhouse Gas Protocol Corporate Accounting and Reporting Standard developed by the World Resources Institute (WRI) and World Business Council for Sustainable Development.2
No additional inputs are required to be entered into the AIA 2030 DDx to calculate the project’s operational carbon. The calculation methodology adapts to the level of detail for the project data entered. See the Operational Carbon DDx Help Page for further information.
Research tab
·The RESEARCH tab can be accessed in two ways:
Select "Research" from the navigation menu at the top
When you are on the Project screen, select "Compare" on the metrics summary.
Additionally, the new project spotlight function enables a way to see how a selected Firm Project compares to the firm project set distribution for the same set of filters. Users select one of their Firm's whole building projects to be “spotlighted” within the Firm project set on the graph. The Net pEUI ranges for each design and measured energy phases for the project will be displayed on the firm set graph (note: the legend shows how the representations of the design phases and measured phases differ in appearance).